Operation; Preparing For Use - Tineco PURE ONE X Serie Manual De Uso

Ocultar thumbs Ver también para PURE ONE X Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46

Operation

Preparing for Use

Note:
• Before the first use, please charge the appliance (see "Charging the Battery") for 3-4 hours in an
area where the ambient temperature is between 39.2°F (4°C) and 104°F (40°C).
• Select an accessory and attach it to the appliance before use (see "Accessories").
Pull the trigger to activate the suction.
• Place the appliance on the wall-mounted dock for convenient storage and recharging after
use.
Place the main body on the dock.
Pull the trigger lock to hold the trigger for
continuous power mode.
To avoid bristle damage, always place
attachments on the dock after use.
32
click
Tabla de contenido
loading

Tabla de contenido