Scenario C: Double Power Supply Line To The Eclick Without Esmartmeter - EMobility eClick Instrucciones De Instalación

Para ebox smart, professional y touch
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 111
Scenario C: double power supply line to the eClick without
eSmartMeter (separate Power supply line for self-supply)
Cut the cable to a length longer than necessary:
This will simplify rerouting and the later installation
of the eSmartMeter.
1. Drill a hole for the AUX cable in the corresponding
routing plate, and insert the provided M20 cable gland.
2. Replace the routing plate in the eClick, and press
this on firmly to ensure tightness.
3. Tighten the cable gland to ensure tightness.
B
All manuals and user guides at all-guides.com
M20 cable gland
The separate AUX supply line must be
protected with its own RCD rated at 6 A.
Introduce the supply cable into the eClick from the top
(T) or the bottom (B). Before you can route the AUX lines,
you must first remove the blue and black jumper on the
mains board. Now place the strands on the contacts as
depicted in the figure, and tighten the screws on the
terminals with a torque of 1,2 - 1,5 Nm.
Note
The cable cross-section of the
separate AUX supply line may
not exceed 1.5 mm².
61
Installation
Caution
If single-phase connection
is required, the mainboard or
eSmartMeters must not be
connected to L2 or L3! The
supply line L1 must always
be connected to L1 of the
mainboard or eSmartMeter.
T
Tabla de contenido
loading

Tabla de contenido