48
eClick installation instructions
European grids
TN-S
TN-C-S
PEN
Signal earth
TN-C
All manuals and user guides at all-guides.com
L1
L2
L3
N
PE
LS
RCD
eClick
L1
L2
L3
N
PE
LS
System earth
RCD
eClick
L1
L2
L3
PEN
Single-phase connection: L1, N, PE,
three-phase connection: L1, L2, L3, N, PE.
Single-phase connection: L1, N, PE,
three-phase connection: L1, L2, L3, N, PE.
A TN-C mains is not supported.
The eClick cannot be connected directly to
a TN-C mains.
If the pre-installation presents a transfer
point from a TN-C to a TN-C-S mains, the
eClick may be connected as described to
the latter. In other words, the TN-C mains
must be converted to a TN-C-S mains.