60
eClick installation instructions
Scenario B: single power supply line to the eClick with eSmartMeter
Caution
1. Detach the cable routing plate from the top (T) or the bottom (B).
2. Introduce the cable through the routing plate, and cut to length.
3. Replace the cable routing plate.
4. The pre-wired cables from the eSmartMeter must be placed on
the mains board.
5. Transfer the black jumper from L1 to L*.
6. Now place the strands on the contacts as depicted in the
figure, and tighten the screws on the terminals with a torque of
1,2 - 1,5 Nm.
B
3a
3b
All manuals and user guides at all-guides.com
3a
3b
For communications with the eSmartMeter, connect
its 3a output to the 3b input (cable provided).
Caution
If single-phase connection
is required, the mainboard or
eSmartMeters must not be
connected to L2 or L3! The
supply line L1 must always
be connected to L1 of the
mainboard or eSmartMeter.
T