EMobility eClick Instrucciones De Instalación página 49

Para ebox smart, professional y touch
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 111
TT
IT
Caution
Installations in a TN-C, TT,
or IT mains must fulfil special
requirements.
All manuals and user guides at all-guides.com
L1
L2
L3
N
LS
PE
RCD
eClick
L1
L2
L3
N
Caution
When multiple charging points
are to be installed, every tenth
must be provided with additional
earthing.
The national standards apply.
A suitable earth electrode must be used.
The suitability of this earth electrode
must be measured to verify its compliance
with the national standards.
Assuming there is an earth electrode of
verified suitability:
single-phase connection: L1, N, PE,
three-phase connection: L1, L2, L3, N, PE.
An IT mains is not supported.
The eClick must not be connected directly
to an IT mains.
Danger
Use only power transmission
cables complying with DIN VDE
18015 and designed for voltages
Umax < 3 %
49
Installation
Note
A separate document describes
how the ePoleDuo is installed.
Tabla de contenido
loading

Tabla de contenido