5.2
[Fig. 5.2.1]
A Level check
7
[Fig. 7.1.1]
A
[Fig.7.1.3]
A
F
H
A Brazing
B Flare joint
C Gas pipe
D Liquid pipe
E Service port
F Indoor unit
G Outdoor unit
H Joint pipe (Accessory part ) * Only for PEH-RP200 when connecting to R407C outdoor unit
[Fig.7.2.1]
A
B
8
[Fig.8.0.1]
G
E
F
B
A Air inlet
C Access door
E Canvas duct
G Connect common reference potential wire between duct-work to air conditioner
A
A Remove the cap
C
A
E
D
A
B
C
F
D
H
G
D
C
A
B Air outlet
D Ceiling surface
F Keep duct-work length 850 or more
6
[Fig. 6.2.1]
100
40
B
A
D
C
7.1
[Fig. 7.1.2]
A
B
A
D
G
E
7.2
E
G
I
J
[Fig.8.0.2]
D
A
B
C
A Inlet duct flange
C Sensor protection plate
E Inlet duct
6.2
A Refrigerant pipe (liquid pipe)
B Refrigerant pipe (gas pipe)
C Drain pipe
D Joint pipe (Accessory part ) * Only for PEH-RP200
when connecting to R407C outdoor unit
42
C
A Thermal insulation
E
B Pull out insulation
C Wrap with damp cloth
D Return to original position
E Ensure that there is no gap here
F Wrap with insulating tape
F
A Insulator
B Drain pipe R1
C Drain pan
D
> =
70 mm
2 × F
E
> =
> =
70 mm
F
> =
35 mm
G Downward slope 20 mm/m or more
H Drain trap
I The drain pipe should extend below this level.
J Open drain
10 mm
E
12.5
25~100 mm
B Inlet temperature sensor
D Sensor fixture
3