Assembly And Connection Evaluation; Subordinate Zones Settings; Important; Initial Setup - Airzone ACUAZONE IBPRO32 Guía De Instalación Rápida

Ocultar thumbs Ver también para ACUAZONE IBPRO32:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6

ASSEMBLY AND CONNECTION EVALUATION

Check the following aspects:
-
The state of the LEDs of the main control board
and the rest of control elements. Check the self-
ES
diagnose section of the data sheet of the
elements.
EN
-
All thermostats are powered.
Important: In the Main Control Board, to verify the
FR
correct performance, check D3, D11 and D19 LEDs.
IT
Main control board
D3
activity
PT
Main control board
D11
power
Association channel:
DE
D19
active

SUBORDINATE ZONES SETTINGS

IMPORTANT: Can only be configured as second zones the zones controlled by a wired zone module.
To configuration secondary zones, follow these instructions:
-
Perform the setup according to the next section.
-
Disconnect the thermostat from the subordinate module. After a few seconds, this module will be available on the
menu of associated outputs.
-
Once all the subordinate module, configure the module or modules main and associate the sub modules that you
want to each one of them.
Note: It is recommended the use of a Blueface thermostat for configuring subordinated zones.

INITIAL SETUP

Important: Before performing the initial set up of the system, configure firstly the subordinated zones, see Subordinate Zones
Settings section.

AIRZONE THERMOSTATS BLUEFACE AND THINK

Important: Once you start the process, it cannot be interrupted. You will be able to modify the desired
parameters later.
Language/Country
Select your language and country. These are the available languages: Spanish, English, French, Italian, German and Portuguese.
32
Meaning
Blinking
Green
Solid
Red
Solid
Red
loading

Este manual también es adecuado para:

Azdi6literbAzdi6litern