Utilitech 148012 Manual De Instrucciones página 15

Ocultar thumbs Ver también para 148012:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Connect the green ground wire from the
power supply to the remaining green ground
screw in the pressure switch and re-attach
the pressure switch cover.
PUMP PRIMING AND STARTUP
PRIMING
CAUTION: All pumps must be primed
(filling the cavity with water) before they are
first operated. This may take several gallons
of water, as the suction pipe will be filled in
addition to the cavity of pump (A).
1. Remove pipe plug or pressure gauge (not
included) at the top of the discharge tee and
the vent plug in front of the discharge tee.
2. Slowly fill the discharge tee with water until
water overflows the vent plug opening.
Replace the vent plug loosely.
NOTE: It will take several minutes to fill pump
(A) and suction pipe completely.
5
Wire from
power
supply
Green
ground
wire
1
Suction
Pipe
2
Vent plug
opening
Vent plug
15
Ground Screws
Wire
from
motor
Priming plug
or pressure
gauge
Vent plug
A
Priming plug
opening
Discharge Tee
A
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

0955549

Tabla de contenido