ANTI-FREEZE KIT (ON REQUEST)
The THIN boiler is fitted as standard with an anti-freeze device that protects the hydraulic circuit. This device is
tripped when the temperature falls to about 6°C. The hot water circuit can be provided with even better
protection by installing an ANTI-FREEZE KIT which starts functioning at 4°C.
ANTI-FREEZE KIT components
1
Adhesive element 72x42-230V-12 W
2
Adhesive element 200x53-230V-30 W
3
Anti-freeze thermostat 4°C –14°C
4
Silicon insulating hood
5
Insulating sheath internal Æ16 mm x 70 mm
6
Wire plug
7
Self-tapping screws
8
Holder strap
9
Element wire ring clip
10 Rapid exchanger
11 Electric board
12 Cold water inlet
13 Hot water outlet
14 Hot water inlet
INSTALLING THE ELEMENTS
Apply the elements 1 and 2; fit them the right way round as
illustrated. Fix the thermostat 3 onto the base located on the
hot water inlet pipe using the screws 7. Insert the electrical
wires in the junction box making sure that the supplied wire
plug 6 is positioned correctly. Connect the wires to the FA1/
FA2 terminals as illustrated (see detail B).
Detail A
Detail B
66