1.3 Turning on and off
Ignition
• Open the gas valve ahead of the boiler.
• Supply the unit with electricity.
Turn the selector 3 onto
• Turn the heating and hot water knob onto the required temperatures.
• The boiler is ready to function automatically whenever hot water is drawn or the room thermostat calls for heat-
ing.
If after the ignition cycle the burners fail to ignite and the red LED comes on, turn the selector onto RESET
for 1 second and then back onto
seconds. If the burners fail to ignite even after the third attempt, refer to chap. 3.1.
In case of an electrical power failure while the boiler is working, the burners will go out and re-ignite auto-
matically when power is restored.
Turning off
Turn the selector onto 0.
When the boiler is turned off, the electronic card is still powered.
Hot water and heating operation are disabled, all the LEDs are off; but the antifreeze function stays on
The antifreeze system will not work if the electricity and/or gas supply to the unit are cut off.
To avoid damage caused by freezing during long shutdowns in winter, it is advisable to drain all water from
the boiler, the tap water and the system water; or drain off just the tap water and add a suitable antifreeze
to the heating system, as prescribed in chap. 2.3.
1.4 Adjustments
Water system pressure adjustment
The filling pressure with the system cold, read on the boiler water gauge, must be about 1.0 - 1.5 bar. If the system
pressure falls to values below the minimum, bring it back to the initial value by operating the filling cock (see fig. 7
part 74). At the end of the operation always close the filling cock.
2. INSTALLATION
2.1 General Instructions
BOILER INSTALLATION MUST ONLY BE PERFORMED BY QUALIFIED PERSONNEL, IN ACCORDANCE WITH ALL
THE INSTRUCTIONS GIVEN IN THIS TECHNICAL MANUAL, THE PROVISIONS OF CURRENT LAW, THE PRESCRIP-
TIONS OF NATIONAL AND LOCAL STANDARDS AND THE RULES OF PROPER WORKMANSHIP.
2.2 Place of installation
This unit is an "open chamber" type model and can only be installed and operated in permanently ventilated
rooms in accordance with the UNI-CIG 7129 standard.
If provided with an antiwind grille, the unit is suitable for operation in a partially protected place in compliance
with EN 297 pr A6, with min. temperature -5°C. If provided with the special antifreeze kit it can be used with min.
temperature as low as -15°C. It is advisable to install the boiler under the slope of a roof, inside a balcony or in a
sheltered recess.
In any case, the place of installation must be free of dust, flammable materials or objects and corrosive gases.
The room must be dry and not subject to freezing.The boiler is fitted to be installed on a wall and is equipped
as standard with a set of brackets. The LEJ LINE plumbing kits also include a paper template to mark the drilling
points on the wall if these kits are used. Secure the bracket to the wall and hook on the boiler. The wall fixing must
ensure a stable and effective support for the generator.
If the unit is enclosed in furniture or mounted alongside, there must be space for removing the casing and
for normal maintenance work.
22
All manuals and user guides at all-guides.com
(winter) or onto
(summer)
or onto
. The controller will repeat the ignition cycle in the next 30
Cod. 3540F130 - 03/2007 (Rev. 00)
TAURA 32 MC