Tabla de contenido
Idiomas disponibles

Idiomas disponibles

REPLACING THE FUSES

WARNING: To avoid electric shock, disconnect the test leads from any
source of voltage before removing the fuse door.
1. Disconnect the test leads from the meter and any item under test.
2. Open the fuse door by loosening the screw on the door using a Phillips
head screwdriver.
3. Remove the old fuse from its holder by gently pulling it out.
3.
Install the new fuse into the holder.
4.
Always use a fuse of the proper size and value ( 10A/250V fast blow
for the 10A range).
5.
Put the fuse door back in place. Insert the screw and tighten it
securely.
WARNING: To avoid electric shock, do not operate your meter until the
fuse door is in place and fastened securely.
www.grupotemper.com
AUTORANGING MULTIMETER
KMD-11
23
Tabla de contenido
loading

Tabla de contenido