Installing Cables And Connectors; Ferrite Core - Mettler Toledo IND246 Guia De Instalacion

Ocultar thumbs Ver también para IND246:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 67
2.4.

Installing Cables and Connectors

Information for installing cables and connectors for the IND246 terminal is provided in this section,
including:
2.4.1.

Ferrite Core

In order to meet certain electrical noise emission limits and to protect the standard IND246 from
external influences, it is necessary to install a ferrite core on the load cell cable connected to the
terminal. The ferrite core is included in the accessory bag supplied with the basic terminal.
To install the ferrite, simply route the cable through the center of the core and then take one wrap
around the outside of the core and route the cable through the center again. Either the complete
cable or the individual wires can be wrapped through the ferrite. This should be done as close to
the enclosure as possible. See Figure 2-15.
2-10
METTLER TOLEDO IND246 and IND246 POWERCELL Installation Manual
Ferrite Core
Cable Glands
Main Board Wiring Connections
POWERCELL Wiring Connections
Wiring Connections for Options
Figure 2-15: Installing the Ferrite Core
64084463
|
03
|
12/2017

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Ind246 powercell

Tabla de contenido