Natural Gas Conversion - Master Forge BG179A Manual Del Usuario

Tabla de contenido

NATURAL GAS CONVERSION

PREPARATION:
10 ft. Natural
Gas Hose
Before beginning conversion, make sure all parts are present. Compare parts with package
contents. If any part is missing or damaged, do not attempt to convert. Contact customer
service for replacement parts.
1. Turn off gas supply, and then remove cap on gas supply side.
2. Recommended: Install a shut-off valve on gas supply side before installing the socket.
3. Socket should be installed by an authorized technician in accordance with the national fuel
gas code (NFPA 54-2015/ANSI223.1-2015).
4. Before inserting plug, turn on gas supply and leak test all connections including the stem of
the shut-off valve and the opening of the socket. For best results, use an ammonia-free soap
and water solution.
OPERATING INSTRUCTION:
1. To connect, push back socket sleeve (Fig. 1).
2. Insert plug and release sleeve (Fig. 2).
3. Push plug until sleeve snaps forward (Fig. 3).
(Gas will flow automatically. Failure to connect plug
properly to socket will inhibit gas flow to the
appliance.)
4. Test connection with ammonia-free soap and water
solution.
To disconnect
1. Pull sleeve back. Pull plug out of socket. (Gas is
automatically shut off.)
2. Close shut-off valve and replace dust caps on socket
and plug.
IMPORTANT:
The 10 ft. Natural Gas Hose is NOT INCLUDED in the product.
11
Fig. 1
Fig. 2
Fig. 3
Tabla de contenido
loading

Este manual también es adecuado para:

0098162

Tabla de contenido