SVGm IP54
3.7.- CONNECTION DIAGRAMS
3.7.1.- 4-WIRE CONNECTION AND CURRENT MEASUREMENT ON THE MAINS SIDE.
RED/ MAINS
S1
S2
L1
P1
P2 S1
S2
L2
P1
P2 S1
S2
L3
P1
P2
N
CARGA / LOAD
Figure 11: Three-phase measuring with 4-wire connection and current measurement on the mains side.
Use the 2 neutral current terminals, as In can be:In ≈ 3 * I
PHASE
92
Instruction Manual