5.- START-UP

When the device has been powered the screen in
Before starting the static generator, it is necessary to follow the steps below:
1.- Go into the configuration screens,
tion.(See
"7 - CONFIGURATION"
2.-
Device "single" or "master"
(
shows the voltage and current (
 Make sure the voltage measurements correspond to the real voltages of the installation.
 Make sure the load current measurements correspond to the current levels of the installa-
tion.
3.- (Device "single" or "master") Go into the numeric values screens,
shows the load parameters (
Make sure the active power measurement of the load corresponds to the active power levels
of the installation.
Make sure the reactive power measurement of the load corresponds to the reactive power
levels of the installation.
 Check the cos ɸ in the three phases. If phases appear with very high reactive power and very
low active power levels, this may indicate an error in the phase order. In this case, check the
power supply and current input connections.
4.- (Device "single" or "master") Go back to the home screen of the device,
no problem with the connections, the upper area should show the message "Stop".
If there is a problem with the static generator connections or the configuration, the "Waiting for con-
ditions" message appears.
5.- (Device "single" or "master") Press the
correctly, the screen will show the message "Run".
Instruction Manual
Figure 25
Figure 25: Home screen.
and set up the device as required for the existing installa-
).
Go into the numeric values screens,
)
"6.2.1 - VOLTAGE / CURRENT / FREQUENCY")
"6.2.3 - POWER AND COS ɸ OF LOAD"
key to start the static generator. If it has started
appear on the display.
, and on the screen that
:
, and on the screen that
):
,
Figure 25
, if there is
105