Weinmann CPAP 20e Descripción Del Aparato E Instrucciones De Manejo página 5

Ocultar thumbs Ver también para CPAP 20e:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CLICK 2 (optional)
24 Filling cap
25 Upper part
26 Outlet
connections
27 Lower part
28 Closures
Legend
24 Filling cap
For filling the humidifier.
25 Upper part
Closes the humidifier, contains the filling cap.
26 Outlet connections
From here the moistened air flows into the
breathing hose.
27 Lower part
Contains approximately 280 ml water.
30 Inlet connections
28 Closures
Used to shut off the pressure gland during
preparatory hygienic operations.
29 Heater
Heats the water in the humidifier. This humidifies
the air.
30 Inlet connections
The air flows from the therapy unit into the
humidifier.
31 Bellows
Dries the CLICK 2.
29 Heater
31 Bellows
EN
Overview
5

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Click 2

Tabla de contenido