Rally RE11RCD Manual De Instrucciones página 25

Tabla de contenido
2
1
2
1.
Front bagger tube
2.
Lower bagger tube
3.
1,'4 x 50,8mm Carriage
Bolts
4.
1/4 Lock nut
2
1.
2.
1/4x 50,8mm Cardage
Bolts
3.
1/4 Lock nut
4.
Vinyl Binding
5.
Dump handle tube
6.
Clevis pin
7.
Retainer apring
2
6MM (114")- 9MM t
1
1. Top Surfaces Even
2.
3. Vertical Adjustment Bracket
4
(_
To Assemble
Bagger
NOTE:
For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
gether.
Holes in front bagger tube are at an angle. Place front
bagger tube against lower bagger tube and check for
proper hole alignment before assembling bolts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8ram carriage bolts and lock nuts supplied.
Tighten securely.
Slide front and lower bagger tube assembly into the
bagger assemby.
Assemble front and upper bagger tubes using four (4)
1/4 x 50,8mm carraige bolts and lock nuts supplied.
Tighten securely.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bag.ger top, install the clevis pin and secure with retainer
spring.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Baggeradjustment
For proper bag function and appearance, it may be neces-
sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
Horizontal adjustment
Slightlyloosenthe nuts securingthe bagger RH and LH
horizontaladjustment brackets.Loosenonlyenoughso
the brackets keep their position,but allow them to be
moved.
Move the brackets the amountforwardor backwardyou
wish the bag assembly to move. Retightenthe nuts
securely.
Vertical adjustment
Slightly loosen the nuts secudng the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger assembly and check the begger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
To convert to bagging,-mulching or discharge
See "Section 5" of this manual.
25
Tabla de contenido
loading

Tabla de contenido