Virutex EVOLUTION PEB200 Manual De Instrucciones página 32

Aplacadora de cantos manual de cola caliente
Ocultar thumbs Ver también para EVOLUTION PEB200:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
10. MACHINE OPERATION
10.1 Edgebanding with the PEB250
Pay attention to safety guidelines.
You must always glue in a clockwise direction (Fig. 26).
When you connect the machine to the mains, the screen F (Fig.
16-3) will display the word OFF and the lower screen E (Fig.
16-3) will display F100, which indicates that the program is
loading. After a few seconds the screens will turn off.
Turn on the main switch A (Fig 16-3), and the real temperature
in the glue tank will appear on screen F, while the desired
temperature is shown on screen E. The white LED B comes on
to indicate that it is working (ON), and the green LED H also
comes on to indicate that the current is reaching the elements.
(Fig. 26)
Select the desired working temperature by adjusting the cur-
sors C and D (Fig. 16-3). This temperature can be set between
120ºC (248ºF) and 200ºC (392ºF). It will depend on the glue
being used. (See information from the glue manufacturer).
E
G
K
F
H
J
When display F shows 115ºC (239ºF) after 10 seconds, the green
LED I (Fig 16-3) will come on to indicate that the motor can
be started by using handle A (Fig. 14). On turning the handle
B
clockwise, the larger the number, the greater the speed of
the motor. The numbers represent the gluing speed in m/min.
A
When the glue reaches the selected temperature, less 5ºC (41ºF),
you will hear a double "Beep" noise and at the same time the
I
green LED G (Fig 16-3) will come on, indicating that you can
now start working. This heating phase can last for between 5
(Fig. 16-3)
and 8 minutes, depending on the preset temperature, the air
C
D
temperature and the condition and quantity of the granulate.
After this initial period you can only glue short pieces.
32 - PEB250 EVOLUTION
loading

Este manual también es adecuado para:

Evolution peb250