Reflex Reflexomat RSC Smart Manual De Instrucciones Original página 23

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50
WARNING
Risk of injury due to heavy weight
The devices are heavy. Consequently, there is a risk of physical injury and
accidents.
Use suitable lifting equipment for transportation and installation.

Note!
Confirm that installation and commissioning have been carried out
correctly in the installation and commissioning certificate. This action is a
prerequisite for the making of warranty claims.
Arrange for specialist personnel or Reflex Customer Service to
carry out the initial commissioning and annual maintenance.
6.1
Installation conditions
6.1.1
Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages during
transport cannot be excluded.
Proceed as follows:
1.
Upon receipt of the goods, check the shipment for
completeness and
possible transport damage.
2.
Document any damage.
3.
Contact the forwarding agent to register your complaint.
6.2
Preparatory work
Condition of the delivered device:
Check all screw connections of the device for tight seating. Tighten the
screws as necessary.
Preparing the device installation:
No access by unauthorised personnel.
Frost-free, well-ventilated room.
Room temperature range: 5 °C to 40 °C.
Protect the device against direct effects of the weather.
Level, stable flooring.
Ensure sufficient bearing strength of the flooring before filling the
vessel.
Filling and dewatering option.
Provide a DN 15 filling connection according to DIN EN 1717.
Provide an optional cold water inlet.
Prepare a drain for the drain water.
Electrical connection,  5 "Technical data",  22.
Use only approved transport and lifting equipment.
The load fastening points on the vessel must be used only as
installation resources.

Note!
No transverse and longitudinal acceleration forces were allowed for when
dimensioning the product. If loads of this type could occur, a special
proof must be provided and agreed.
6.3
Execution
ATTENTION
Damage due to improper installation
Additional device stresses may arise due to the connection of pipes or system
equipment.
Pipelines must be connected so there are no residual forces and torques
and must be routed so they are free from vibrations.
If necessary, provide support structures for the pipelines or equipment.
If you have any questions, please contact Reflex After Sales & Service.
Proceed as follows for the installation:
1.
Position the device.
2.
Create the water-side connections of the system.
3.
Create the interfaces according to the terminal diagram.
6.3.1
Observe the following tips when siting the vessel:

6.3.2
Risk of injury due to falls or stumbling
Bruising caused by falls or stumbling over cables or pipes during installation.
ATTENTION
Damage to cables and pipes
If cables and pipes are not routed professionally between tanks and the control
unit, they may become damaged.

Reflexomat RSC Smart — 08.01.2024-Rev. A
Locating the vessel
All flange openings are inspection and maintenance openings.
Locate the vessel with a sufficient side and top clearance.
If an adequate visual inspection is not possible, suitable technical
resources must be used (mirror, endoscope, etc.).
Install the vessel on a level surface.
Ensure a perpendicular and free-standing position.
Ensure proper functioning of the "LIS" Filling level measurement sensor.
Do not attach the vessel firmly to the floor.
Note!
The weight measuring cell is not resistant to water hammer; also it must
not be painted.
Connection to the facility system
CAUTION
Wear personal protective equipment (helmet, protective clothing, gloves,
safety boots).
Ensure proper installation of cables and pipes between the control unit
and the vessels.
Route cables and pipes in a professional manner over the flooring.
Note!
Each vessel connection on the water side must be provided with a cap
valve and a draining device (included in the scope).
Installation
English — 23
loading