Mitsubishi Electric CITY MULTI PEFY-P25 VMS1-E Manual De Instalación página 5

Ocultar thumbs Ver también para CITY MULTI PEFY-P25 VMS1-E:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29
[Fig. 9.3.1]
[Fig. 9.3.3]
F
G
E Use PG bushing to keep the weight of the cable and external force from being
applied to the power supply terminal connector. Use a cable tie to secure the
cable.
F Power source wiring
G Tensile force
H Use ordinary bushing
I Transmission wiring
[Fig. 9.3.5]
M1
M2
B
C
[Fig. 9.5.1]
A
B
A Screw holding cover (2pcs)
B Cover
E
H
I
A
S
A Terminal bed
B Round terminal
D
C Shield wire
D The earth wire from two cables are connected together to the S terminal. (Dead-end connection)
E
E Insulation tape (To keep the earth wire of the shielded cable from coming in contact with the transmis-
sion terminal)
C
E
D
<Address board>
9.3
[Fig. 9.3.2]
A
[Fig. 9.3.4]
K
L
1
M1
M2
S
J Power source terminal bed
K Terminal bed for indoor transmission
L Terminal bed for remote controller
M To 1-phase power source
N Transmission line DC 30 V
O Terminal bed for outdoor transmission line (TB3)
P Transmission line to the remote controller, terminal bed for indoor unit and
BC controller
9.5
A
A SWA
B SWC
C SW1
2
D SW11
E SW12
F SW14
1
B
F
B
A Terminal bed box
C
B Knockout hole
C Remove
J
P
2
N
M1
M2
O
N
M
L
5
loading

Este manual también es adecuado para:

City multi pefy-p20 vms1-eCity multi pefy-p15 vms1-eCity multi pefy-p32 vms1-eCity multi pefy-p40 vms1-eCity multi pefy-p50 vms1-eCity multi pefy-p63 vms1-e ... Mostrar todo