External diameter of
pipe Ø [mm]
6.35 (1/4")
9.53 (3/8")
12.7 (1/2")
15.9 (5/8")
Table 35 Key data of pipe connections
3.4.2
Connecting condensate pipe to the indoor unit
The condensation catch pan of the indoor unit has two connections. A
condensate hose and bung are mounted on these connections at the
factory and can be replaced ( Fig. 61).
▶ Only route the condensate hose with a slope.
3.4.3
Checking tightness and filling the system
Checking tightness
Observe the national and local regulations when carrying out the
tightness test.
▶ Remove the caps of the gas,service and liquid line valves ( Fig. 68,
[1], [2] and [3]).
▶ Connect the Schrader opener [6] and pressure gauge [4] to the
service connection [1].
▶ Screw in the Schrader opener and open the Schrader valve [1].
▶ Leave valves [2] and [3] closed and fill system with nitrogen until the
pressure is 10% above the maximum operating pressure (
Page 33).
▶ Check whether the pressure is still the same after 10 minutes.
▶ Discharge the nitrogen until the maximum operating pressure is
reached.
▶ Check whether the pressure is still the same after at least 1 hour.
▶ Discharge nitrogen.
Filling the system
NOTICE
Malfunction due to incorrect refrigerant
The outdoor unit is filled with R32 refrigerant at the factory.
▶ If refrigerant needs to be topped up, only use the same refrigerant.
Do not mix refrigerant types.
▶ Evacuate and dry system with a vacuum pump ( Fig. 68, [5]) until
the pressure is approx. −1 bar (or approx. 500 microns).
▶ Open the valve at the top [3] (liquid side).
▶ Use a pressure gauge to [4] check whether the flow is unobstructed.
▶ Open valve at the bottom [2] (gas side).
The refrigerant is distributed round the system.
▶ Afterwards, check the pressure ratios.
▶ Unscrew the Schrader opener [6] and close the Schrader valve [1].
▶ Remove the vacuum pump, pressure gauge and Schrader opener.
▶ Reattach the valve caps.
▶ Reattach the cover for pipe connections to the outdoor unit.
Climate 2000 – 6721852025 (2024/01)
Tightening torque [Nm]
Flared opening diameter
18-20
32-39
49-59
57-71
Flared pipe end
(A) [mm]
8.4-8.7
90°± 4
13.2-13.5
A
16.2-16.5
19.2-19.7
3.5
Electrical connection
3.5.1
General notes
WARNING
Risk to life from electric shock!
Touching live electrical parts can cause an electric shock.
▶ Before working on electrical parts, disconnect all phases of the
power supply (fuse/circuit breaker) and lock the isolator switch to
prevent unintentional reconnection.
▶ Work on the electrical system must only be carried out by an
authorised electrician.
▶ An authorised electrician must determine the correct conductor
cross-section and circuit breaker. The maximum current
consumption of the technical data ( see chapter 8, page 33) is
decisive for this purpose.
▶ Observe safety measures according to national and international
regulations.
▶ If you identify a safety risk in the mains voltage, or if a short circuit
occurs during installation, inform the operator in writing and do not
install the appliances , until the problem has been resolved.
▶ All electrical connections must be made in accordance with the
electrical connection diagram.
▶ Only use a special tool to cut cable insulation.
▶ Connect the cable to the existing mounting clips / cable glands using
suitable cable ties (scope of delivery).
▶ Do not connect any additional consumers to the mains power supply
of the device.
▶ Do not mix up live and PEN conductor. This can lead to malfunctions.
▶ If the mains power supply is fixed, install an overvoltage protector
and isolator which is designed for 1.5 times the maximum power
input of the appliance.
To improve the EMC process, use the magnetic ring and belt. For that,
pass the belt through the hole of the magnetic ring to fix it on the cable.
3.5.2
Connecting the indoor unit
The indoor unit is connected to the outdoor unit using a 5-wire
communication cable of the type H07RN-F. The conductor cross-section
of the communication cable should be at least 1.5 mm
NOTICE
Material damage can be caused by connecting the indoor unit
incorrectly
Voltage is supplied to the indoor unit via the outdoor unit.
▶ Only connect the indoor unit to the outdoor unit.
To connect the communication cable:
▶ Fold up the top cover ( Fig. 69).
Pre-assembled flare nut
thread
3/8"
3/8"
5/8"
45°± 2
3/4"
R0.4~0.8
2
.
Installation
29
loading

Este manual también es adecuado para:

Cl2000u w 26 eCl2000u w 35 eCl2000u w 53 eCl2000u w 70 eCl2000 26 eCl2000 35 e ... Mostrar todo