Preparing for operation
Preparing the calibration and
adjustment facility
The following points must be guaranteed before the
calibration and adjustment facility is operated for the
first time:
Check all parts of the calibration and adjustment
facility for proper function and visible damage.
Make sure that no damage impairs the function of
the calibration and adjustment facility.
Make sure that all attaching parts are firmly
seated.
Position the transducer in the flange.
A socket for a 3.5 mm jack plug is located on the
circumference of the transducer. The PC can be
connected here. Use only the 3.5 mm jack cable
and the USB adapter from STAHLWILLE for this
purpose.
Connect the transducer to the PC.
Preparing the PC
Connect the transducer to the jack cable and the
USB adapter.
Connect the USB adapter to the PC.
Start the TORKMASTER 4 programme on the PC.
Preparing for operation
23