Thermador Pro Harmony Professional Serie Guia De Instalacion página 13

Ocultar thumbs Ver también para Pro Harmony Professional Serie:
Idiomas disponibles

Idiomas disponibles

Remove the green ground screw and serrated washer
9.
located beneath the terminal block. Screw one end of
the included white jumper wire to the chassis beneath
the terminal block with the green ground screw. Secure
the other end of the wire to the center stud of the termi-
nal block with a nut.
a
a
Red / L1
b
Ground link wire provided in small bag
c
White / neutral
d
Black / L2
Tighten all connections and nuts securely.
10.
Reinstall the terminal block cover.
11.
6.5 Electric wiring diagrams and schematics
The electric wiring diagrams and schematics are attached
behind the toe kick panel, and should not be removed ex-
cept by a service technician, then replaced after service.
c
d
b
7 Installation procedure
Installation procedure
Installation procedure
7.1 Adjusting the leveling legs
For proper performance, the range must be level. Priority
should be placed on ensuring that the oven cavity is also
level for optimum cooking performance.
NOTICE:
The top edges of the range's side panels must be on the
same or higher level as the adjacent countertop.
DO NOT operate the range if sides are lower than the
adjacent cabinet. If the range is operated while at a
lower height relative to the adjacent cabinet, the cabinet
could be exposed to excessive temperatures, causing
damage to the cabinet and countertop.
Line up the range in front of the opening.
1.
Measure the countertop heights first with a tape mea-
2.
sure and add an additional 1/16'' - 1/8'' (2-3 mm).
Rotate the legs using a 12" (305 mm) adjustable wrench
3.
on the flat sides of each foot.
Leveling legs should be adjusted so that the range
4.
sides are at the same or higher level as the adjacent
cabinet. Adjust the legs accordingly prior to pushing the
range back to its final location.
It may be necessary to reposition the electrical cord as
the range is pushed back to its final position. This may
be accomplished by carefully pulling on a rope or twine
looped around the electrical supply line as the range is
pushed back into its final installed position.
As the range is moved into its final, installed position,
5.
verify that the anti-tip bracket is in a position to engage
the range.
7.2 Placing the range
CAUTION
Unit is heavy and requires at least two persons or proper
equipment to move.
It is recommended to wear protective clothing during the
lifting process.
Wear gloves and long sleeves to protect hands and
forearms from abrasion and potential scratches.
Take off watches and jewelry.
Wear work shoes for foot protection.
Installation procedure en-us
13