Salicru EQUINOX EQX2 4002-HT Manual De Usuario página 84

Idiomas disponibles

Idiomas disponibles

5.6. GENERAL INSTALLATION DIAGRAM.
PV DC circuit
breakers
Installation of photovoltaic
panels
Fig. 64. Inverter installation diagram.
- Colour code used to represent the distribution and installation
network: BLACK, BROWN or GREY for phases L1, L2 and L3,
and BLUE for the neutral.
- Colour code used to represent the earth cable: YELLOW-GREEN.
- Colour code used to represent the DC power of the installation:
RED for the positive cables and BLACK for the negative cables.
- Colour code used to represent communications between the
installation's units: PURPLE.
84
Battery system
installation
Inverter
installation
ESM1 90D24 EQX2
Loads
AC ON-GRID protections
AC BACK-UP protections
In order not to overload the diagram, the earth cables have
only been represented at the earthing connection points of
the protection devices, the inverter and the battery system.
Distribution network
Connection point / Meter
CGMP
(General Control and
Protection Panel)
CMP BACK-UP (BACK-UP
Control and Protection Panel)
BACK-UP
loads
SALICRU
loading