Salicru EQUINOX EQX2 4002-HT Manual De Usuario página 67

Idiomas disponibles

Idiomas disponibles

Questions
3
What happens if
The overall load power prioritisation is changed.
the battery reaches
The battery remains on standby waiting for the
the minimum SOC
solar panel power in order to charge, while the
(maximum DOD)?
consumption loads are supplied from the grid.
When solar panel power is available, it is used
to charge the battery. This state is maintained
until SOC ≥ min. SOC + 5%. Once this state is
exited, the overall load power prioritisation is
restored.
4
What happens if the
The hybrid supplies the back-up load from solar
grid is lost?
panels and if there are surpluses, it charges
the battery, if not, it discharges it to supply the
back-up load. In addition, the generation power
is higher, it is no longer the PAC of FAQ3.
5
Why does the hybrid
The hybrid only waits for the grid without
keep waiting for
generating the first time it is installed. Once
the grid instead of
installed and turned on for the first time, it
generating?
can generate power without needing to be
connected to the grid as the battery keeps it
always on. This is not necessary in Off-Grid
mode, as there is never a grid in this mode.
6
Why isn't the hybrid
One of the following solutions may resolve this
version optimal and
issue:
why does it import
-Depending on the type of battery, it must be
from the grid when
fully charged first.
it has battery power
-The PeakLoad Shifting option is enabled and
available?
therefore the battery does not discharge until it
reaches a power consumption higher than Pmax
(this parameter can be configured from the app).
Disable this option and try.
-The battery type is configured incorrectly. It can
be configured from the inverter display or from
the app.
-DOD is too low. A maximum DOD of 80% is
recommended. This parameter is configured
from the app.
Tab. 7. General mode FAQs.
4.5.2. OFF-Grid mode.
4.5.2.1. Brief introduction.
In Off-Grid mode, the grid is never available, so only the back-up
load can be supplied. The first priority is to make use of the solar
panel power, and if it covers the back-up consumption, the sur-
pluses are used to charge the battery. In the event that the solar
panel power is not sufficient, the shortfalls are covered with the
battery.
In this type of installation, the supplied meter is not used
(item 7 in the Packing List).
The battery system must be connected to the inverter for
this work mode to function.
USER MANUAL
4.5.2.2. OFF-Grid mode.
Answers
The installation's consumption is supplied first of all by the power
generated by the solar panels; if the consumption is higher,
the battery power is used, and if it is lower, the battery is charged
with the surpluses from the solar panels.
Tab. 8. OFF-Grid mode FAQs.
4.5.3. UPS mode.
4.5.3.1. Brief introduction.
UPS mode seeks to charge the battery in the shortest possible
time in order to be prepared in the event of a  possible power
outage and thus be able to supply as much energy as possible.
UPS mode kicks in when the grid is lost, so there are two possible
states:
1.
Fig. 19. OFF-Grid mode.
Battery charge
PV surpluses
1
Battery
-
PV
-
Fig. 20. Work priorities in "OFF-Grid" mode.
Questions
1
What is the
The maximum Back-up Load power is 110% of the
maximum Back-up
rated power of the inverter
Load power?
2
What is the
The maximum generation power is higher than PAC
maximum
and depends on the overload that the inverter can
generation power?
withstand. (It is the same as the maximum Back-up
Load power)
3
What happens if
The battery remains on standby if there are no solar
the battery reaches
panels, and the back-up load is not supplied. If there
the minimum SOC
are solar panels, the battery is charged to SOC ≥ min.
(maximum DOD)?
SOC + 5%, then the back-up load is supplied.
UPS OFF
mode: In this state, there is a grid and the aim is
to charge the battery at maximum power, so all of the solar
panel power is used for the battery and, if it is not enough,
the grid is used to charge it at maximum power. The normal
load and the back-up load are supplied from the grid, or from
solar panel surpluses, if they produce enough power to charge
the battery to the maximum and have surpluses.
Prioritisation
Supplying the loads
-
2
1
Answers
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
67
loading