Salicru EQUINOX EQX2 4002-HT Manual De Usuario página 82

Idiomas disponibles

Idiomas disponibles

5.5.2. Steps for connecting the CT to the ESM1
90D24 EQX2 meter.
In order for the meter to read the current that circulates through
the installation, the transformer (CT) must be connected in the di-
rection indicated by the arrow inside the housing: from the loads
to the grid. Install it at the same point where the voltage is read.
GRID
P2
Pin
CT pin
Cable code
5
S1
L1 cable
6
S2
7
S1
L2 cable
8
S2
9
S1
L3 cable
10
S2
IMPORTANT: respect the
order of phases L1, L2, L3
Fig. 60. View of the CT transformer connections.
Installation steps:
Open the CT.
1.
The current transformer must be installed right after the IGA.
2.
Pass the network cable in the direction of the current,
3.
as  shown with the arrow: of the installation
grid (P2).
Close the CT.
4.
82
CONSUMPTION
P1
L3
L2
L1
(P1)
to the
5.5.3. Steps for the connection of
communications between meter
and inverter.
The communications cable required for connection to the meter is
connected to the inverter at the factory. It is identified as METER.
If you have accidentally disconnected it or need to connect
a longer one, etc., unscrew the protective casing, pass it through
the left cable gland that is labelled METER and connect it to the
RJ45 port labelled with the same name.
Fig. 61. Identification of the RJ45 port on the inverter.
Connect the other end of the cable to the RJ45-2 port on the
meter as follows:
Fig. 62. Connecting the cable to the RJ45-2 port.
SALICRU
loading