Salicru EQUINOX EQX2 4002-HT Manual De Usuario página 60

Idiomas disponibles

Idiomas disponibles

Inverter operation indicator.
Grid status indicator.
Inverter status indicator.
Battery level indicator.
Earthing connection symbol, the inverter housing must be
properly earthed.
Tab. 2. Inverter symbols.
2.3.1.2. Inverter label symbols.
The inverter may not be disposed of with household waste.
Please read the instructions carefully before installation.
Do not touch any internal part of the inverter for 5 minutes
after it has been disconnected from the grid and from the
photovoltaic input.
CE marking, the inverter meets the requirements of the
applicable CE directives.
SGS certification.
TÜV certification.
Danger. Risk of electric shock.
Do not touch. Hot surface during operation.
Danger of electric shock, live parts, risk of electric shock,
do not touch.
Tab. 3. Labelling symbols.
2.3.1.3. Packaging symbols.
Handle with care.
Indicator of the correct direction of the packaging.
Earthing connection symbol, the inverter housing must be
properly earthed.
6
Stacked layers 6.
3. QUALITY ASSURANCE
AND STANDARDS.
3.1. MANAGEMENT STATEMENT.
60
SALICRU
loading