Zodiac Nature2 Fusion soft Manual De Instalación Y Operación página 24

Ocultar thumbs Ver también para Nature2 Fusion soft:
Idiomas disponibles

Idiomas disponibles

Page 24
ENGLISH
Wait at least one (1) minute after applying power. See note 1.
POS-2
Placing the jumper in POS-2 allows the chlorinator to operate in the opposite way to POS-1. With 24
Volts AC applied to the ORP 24 VAC inputs, chlorine production will be enabled. The front panel of the
power supply will display a production rate of 0% to 100%. When the 24 Volts AC is removed the chlorine
generator will flash "EC" every few seconds and chlorine production is disabled.
SUMMARY
POSITION OF J14
POS-1 (default)
POS-2
Note 1 The unit samples the external control/ORP settings at the instant power is applied to the chlorinator and will
not respond to any changes during the first minute of operation. The unit may appear to be STUCK IN or
STUCK OUT of "EC" mode. Wait several minutes until the unit has warmed up to verify the changes made to
external control set-up.
Note 2 Unlike the previous production models with ORP control, multiple chlorinators can be linked together to be
controlled with one ORP controller without the use of external relays and transformers. Contact the factory for
more information.
ORP
Connector J15
R0474300
ORP Jumper J14
Figure 17.
Movable ORP Jumper J14
Section 4.
Pool Water Preparation
4.1
Determining Pool Size (Gallons of Water in Your Pool)
Rectangular Pools
Average length (feet) x average width (feet) x average depth (feet) x 7.5 = gallon capacity.
Circular Pools
Diameter (feet) x diameter (feet) x average depth (feet) x 5.9 = gallon capacity.
Oval Pools
Long diameter (feet) x short diameter (feet) x average depth (feet) x 5.9 = gallon capacity.
Sloping Sides
Multiply total gallons by 0.85 = gallon capacity.
Zodiac
Nature
®
24 VAC
Unit OFF, displays EC
Unit ON, displays 0-100%
J 2
|
2
Fusion soft
Installation and Operation Manual
®
0 VAC
Unit ON, displays 0-100%
Unit OFF, displays EC
Wires to the
external
ORP Controller
J 2
Chlorine Generator Power
Interface Board
loading