Page 16
ENGLISH
2.
The control/power center comes with two (2) full length, heavy duty mounting brackets fastened to the back
of the power center during shipping. Remove the four (4) screws that are holding the two (2) brackets and the
cardboard shipping cover in place (see Figure 7). Remove and discard the cardboard.
3.
Using the top mounting bracket as a guide, mark three (3) holes on the mounting surface where the power center
will be installed. Drill the holes in the mounting surface.
NOTE The three (3) mounting holes are 4" (10 cm) apart center to center.
NOTE Use heavy-weight screws. The power center with all available components installed weighs approximately 30
pounds.
4.
Reinstall the mounting brackets to the top and bottom of the back of the control/power center using the four (4)
screws that were removed in Step 2. Ensure that the brackets are rotated from the original shipping position.
5.
Hang the power pack on the surface using the three (3) holes drilled in Step 3. With the control/power center in
place, mark three (3) holes for the bottom bracket mounting.
NOTE As with the top brackets, the bottom bracket requires three (3) mounting holes. The three (3) mounting holes
are 4" (10 cm) apart center to center.
6.
Drill the holes and install the screws.
7.
Level the control/power center and tighten all screws, ensuring that the control/power center is securely fastened
to the mounting surface.
8.
Check source voltage. (All units are factory wired for 240 VAC).
factory wiring of the power center must be changed. (see
3.8
Grounding and Bonding
A solid, copper # 8 awg (8.4 mm
ground connection that is acceptable to the local inspection authority. Refer to your local codes for the acceptable
grounding wire gauge.
The National Electrical Code
determine if the NEC and/or other local installation codes are enforced by the Authority Having Jurisdiction (AHJ).
A solid, copper # 8 AWG (8.4 mm
bonding connection that is acceptable to the local AHJ. Refer to your locally enforced codes for the acceptable
bonding wire gauge. Attach the bonding point located on the bottom of the chassis backplate to a common earth
bonding point. Do not use the power pack as the common bonding point. Each piece of non-related pool equipment
requiring a ground should also be bonded to the common, approved earth bonding point. Never ground a pool pump
to the chassis backplate.
3.9
Model Re-Configuration
The Nature
Fusion Soft power interface board is configured as a Nature
2
If installing a Nature
Fusion Soft 700 model the power interface board MUST be re-configured.
2
To configure the board as a Nature
Figure 8.
If the power interface board is not re-configured, the life of your Nature
Zodiac
Nature
®
) wire is recommended for connecting the control/power center to a permanent earth
2
(NEC
) requires pool equipment to be bonded to each other. Check your local codes to
®
®
) wire is recommended, per the NEC, for bonding the power pack to a permanent
2
IMPORTANT
Fusion Soft 700 model, use cutting pliers to cut the JL1 jumper as shown in
2
CAUTION
|
2
Fusion soft
Installation and Operation Manual
®
In order to use on 120 VAC, the internal
Figure 11
Fusion Soft 1400 model by factory default.
2
Fusion Soft will be shortened.
2
and
).
Figure 13