As soon as the torque wrench has cut out,
it is ready for the next job.
Maintenance
The internal mechanisms of the torque
wrench are subject to normal wear and
tear under operating conditions. For this
reason, the accuracy of the cut-out should
be checked at regular intervals.
Unless otherwise indicated in the user's
internal regulations (e.g. test equipment
inspection to ISO 9000 et seq), an
inspection must take place after approx.
5000 operations or every 12 months,
whichever is the shorter. The time frame
(12 months) starts with the first usage.
If inspection shows that there is a
deviation, the torque wrench must be
adjusted.
The inspection and adjustment must be
carried out in accordance with
DIN EN ISO 6789.
40
ã
C AUTI O N !
Important! Once the
wrench has cut out,
never apply more
pressure! You should
therefore not pull too
fast in case you cannot
stop the motion quickly
enough when you hear
the click.