.On delivery
.Remove the packaging and check that there is no sign of damage.
.Free the machine from the blocks on the base.
.Immediately report any damage to the carrier.
.1
ITA
.1a
ENG
.Electrical connection
FRA
Ensure that the line has the same voltage indicated on the machine data plate. Power must be sup-
ESP
plied through a disconnecting switch with a capacity suitable for the machine power requirement,
using a three-phase socket with four contacts (3 phases + earth). Connect to the electric panel termi-
РУС
nals. Before powering the machine, ensure that no connections have worked loose during transport.
The connection must be made in conformity with the regulations in force in the country of use.
.2
22
INSTALLATION
.Levelling and fixing
Place the machine on a flat floor surface. Sufficient
space must be left around the machine to allow work
and maintenance operations. The machine is equip-
ped with wheels and can be easily positioned in the
desired place. It is levelled by regulating the vibration-
damping feet (fig. 1), ensuring that the machine does
not rest on the wheels while operating. Fit the pressu-
re handle in the gear container on the head and block
it with the handwheel provided (fig.1a).
The following operations must be entrusted to the personnel making the electrical
connection.
.First start-up and test
Press the START button (see control panel, fig.4).
Lower the forming handle and check that the plate
is turning in the direction of the arrow (clockwise), as
indicated at the side (fig.2). Otherwise invert the two
phase wires. Perform the whole work cycle at least
once without using the dough. To stop the machine
press the STOP button (see control panel, fig.4).
Any fault caused to the machine by incorrect manoeuvres or by tampering during the
period in which it is covered by the guarantee may affect its validity.
The electrical connection must be
made exclusively by qualified per-
sonnel.
SPA SA