Demolition And Disposal - Tecno-gaz STERILAIR PRO Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 101
7. Close the upper casing reconnecting the earth connection Fg.11 
8. Insert the 2 screws on the sides of the casing removed in phase 1. Finally insert the 
4 screws of the cover as in phase 2. 
 
MAKE  SURE  THE  FOUR  LAMPS  SWITCH  ON  PROPERLY  BY  CHECKING  THE 
CORRESPONDING INDICATOR LIGHTS.  
 
At  the  end  of  each  maintenance  operation,  both  when  replacing  the  filter  and  the 
lamps,  you  must  report  the  date  and  name  of  the  assistance  centre  which  performed 
the operation on the label affixed at the side of the device (spare part: code SSAA013).  
Trimester N°:  Description of intervention 
START 
1° 
 
2° 
3° 
Serial number 
S/N: 
 
At the end of the lifecycle of the lamps, together with replacement of worn components 
(filter  and  lamps),  a  new  yearly  plate  will  be  affixed.  ENTER  THE  DATA  ON  THE  START 
AND S/N LINE. If the maintenance intervention is not respected or reported, it will be 
necessary to reset the routine maintenance program by replacing the lamps which could 
have  reached  the  end  of  their  lifecycle  and  the  filter  which  could  dirty  the  lamps 
reducing their performance. 
N.B. Whenever it is necessary to replace the lamps, it is not possible to change only one.
DEMOLITION AND DISPOSAL
 
Refer to annex
Cod. 0Z00H0004
 
 
YEARLY ROUTINE MAINTENANCE 
Installation / changing 
lamps and filter 
Filter change           
Filter change           
Filter change           
Fg.13 
 
19 
ENGLISH
Date 
C.A.R. 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
Tabla de contenido
loading

Este manual también es adecuado para:

Sa210zsa

Tabla de contenido