Installation
Mounting Options:
24" and 26" Radiance Displays :
Each step bracket is stamped with a part number (P/N). For Radiance 24" and 26" displays, select step
bracket P/N 20C0660. Replace the left hand mounting screws with 2 of the provided mounting screws, do
not tighten them. Remove the two right hand screws from the VESA mount . With the side stamped FRONT
facing the front of the display, slide the step bracket between the VESA mount and the back of the display
until notches labeled for the display you are working with fit over the two left hand screws. Replace the
right hand screws with the screws provided and tighten all screws. With the black surface of a ZeroWire Rx
or Tx module facing the front of the display, align the slot on the bottom of the module with the top of the
bracket and push the module down on the bracket until the module seats.
This side faces the
front of the display.
19" and 23" Radiance and 24" EndoVue Display:
Each step bracket is stamped with a part number (P/N). For Radiance 19" and 23" and EndoVue 24"
displays, select step bracket P/N 20C0683. Replace the left hand mounting screws with 2 of the provided
mounting screws, do not tighten them. Remove the two right hand screws from the VESA mount . With the
side stamped FRONT facing the front of the display, slide the step bracket between the VESA mount and
the back of the display until notches labeled for the display you are working with fit over the two left hand
screws. Replace the right hand screws with the screws provided and tighten all screws. With the black
surface of a ZeroWire Rx or Tx module facing the front of the display, align the slot on the bottom of the
module with the top of the bracket and push the module down on the bracket until the module seats. The
completed assembly will look like Figure 1 above.
This side faces the
front of the display.
3
Figure 1.
Typical ZeroWire installation on a NDS
Radiance 26.