First Use - GYS POWERDUCTION 110LG Manual De Instrucciones

Ocultar thumbs Ver también para POWERDUCTION 110LG:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
Translation of the original instructions
Protection class
Dimensions (cm)
Weight (kg)
Internal fuse
DESCRIPTION OF THE MACHINE (FIG I)
1
Heat authorisation illuminated button
2
Main switch
3
Heating power indicator (
4
Heating power settings or temperature unit button
5
Cooling liquid temperature
6
Inductor or machine fault indicator
7
Cooling circuit warning alarm indicator
8
Machine or cooling circuit thermal protection indicator
9
Inductor change indicator
10
Inductor change mode activation button
11
Lance button : start the heat
12
LED worklight (illuminates the heating point)
13
Lance attachment. For a 36 mm spanner
14
Adapter attachment : 27 mm spanner
15
Adaptor
16
Inductor
17
Pneumatic pedal connection
18
USB reprogramming socket
19
Outdoor temperature control connector (160LG)
20
Pneumatic pedal

FIRST USE

The POWERDUCTION 110LG
The POWERDUCTION 160LG / 220LG
earthed plug.
1. Once the product is assembled, place the torch on its support. Unscrew the inductor and the tank's cap.
2. Fill up the tank to the maximum using special welding liquid coolant (30 l / 7 l).
3. Take the lance and place it at the tank inlet or above the filling canister.
4. Connect the machine to the mains.
Switch on the machine (1).
5. The machine starts and will systematically display Error 6 or 7 («E-6» or «E-7»).
6. Press the accessory change button (10) twice. The purge cycle takes 5 seconds (a loading icon should be displayed
during it) and a double «beep» sound indicates completion.
7. As soon as the liquid is coming out of the torch, stop the torch by pressing the torch button, the accessory change
button or the heat authorisation button. Or wait for «E-6» to be displayed.
If Error 7 is displayed, start again from step 6 (five times max, see default E-7 explanation).
8. Screw the inductor by hand.
9. Press the accessory change button (10) twice. The purge cycle takes 5 seconds (a loading icon should be displayed
during it) and a double «beep» sound indicates completion.
10. The temperature of the cooling liquid and the power instruction are displayed.
11. Top up the tank with cooling liquid if required.
12. Replace the tank cap. The product is ready to operate.
Solving fault E-7
If the issue remains, check that the pump is working correctly or that the pipe is not blocked.
After five unsuccessful purge cycles, it is possible to:
- Stretch the torch above the machine to clear any pocket of water and for the pump to kick in.
- Put the machine at a 30° angle towards the torch.
- It is possible to blow the torch. Use an air blower and a cloth to keep it water proof and avoid projections.
- Re-attempt one or two cycles after each action.
If the issue remains, check that the pump is working correctly or that the pipe is not blocked.
26
POWERDUCTION 110LG / 160LG / 220LG
88 x 60 x 60 cm
86
T5A - 250VAC -
T2.5A - 500VAC
6.3x32
110LG : 1 kW – 11 kW, 160LG : 1 kW – 16 kW 220LG : 2 kW – 22 kW
is supplied with a 5 m power cable fitted with a 16A, 5-pin, earthed plug.
(except 208-240V)
(except 208-240V)
IP 21
80
130
T5A - 250VAC -
- 6.3x32
6.3x32
is supplied with an 4 m power cable fitted with a 32A, 5-pole
EN
118 x 80 x 60
120
130
T2.5A - 500VAC - 6.3x32
).
Tabla de contenido
loading

Este manual también es adecuado para:

Powerduction 160lgPowerduction 220lg

Tabla de contenido