Product Specifications; First Use - GYS COMBIDUCTION AUTO 50 LG Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
Operating manual

PRODUCT SPECIFICATIONS

Input-voltage rating
Assigned frequency
Number of conductors
Input-current rating
Input-power rating
Treatment frequency
Output-power rating
Power cable length
Lance length
Tank capacity
Coolant
Protection rating
Min. dimensions
power generating unit
Weight (kg)
Dimensions (cm)
Internal fuse
DETAILED DESCRIPTION (FIG I)
1
Main switch
2
Illuminated power button
3
Connector for bodywork accessories
4
Heating capacity indicators (1 kW - 5 kW)
5
Buttons for setting the heating power or choosing the temperature display unit
6
Coolant temperature and setpoint
7
Power-source or inductor-fault warning light
8
Cooling system warning light
9
The power source's or cooling system's thermal-protection warning light
10
Inductor-change mode warning light
11
Inductor-change mode activation button
12
Lance button: triggers heating
13
The heating point's LED lighting
14
Lance attachment. For a 32 mm spanner
15
For a 27 mm spanner
16
Complete inductor
17
Foot pedal connector
18
Pneumatic foot pedal

FIRST USE

The COMBIDUCTION comes with an eight metre power cord complete with a five-pin 32 A 50/60 Hz power socket. To
ensure this product's optimum performance, it must be plugged into an electrical outlet with 32 A protection and be
protected in accordance with current standards. The machine is supplied with a 32 A - 16 A adapter. It allows the pow-
er source to be used on a 16 A socket in accordance with short-term work standards, mainly for removing nuts. To
operate without activating the mains protection, set the power to 3.5 kW 70% (see connection instructions).
1. Once the product has been assembled, position the lance on its support. Remove the cap from the lance and the tank.
2. Fill the tank to the maximum with the special welding coolant.
3. Take the lance and place it over a bucket or an empty jerry can.
4. Connect the product to the mains network.
Flip the main switch (1) to the ON position.
5. The product will start and repeatedly show Error 7 («E-7»).
6. Press the inductor change button (11) twice. The purge cycle takes five seconds and is indicated by a loading sign
shown on the display screen. A double beep indicates the end of the cycle.
7. As soon as the liquid comes out of the lance, stop the flow by pressing the lance button (12) or wait for the display mes-
sage «E-6». If the display shows «E-7», repeat the process from step six (a maximum of five times, otherwise refer
to the «E-7 Fault Correction» section).
Translation of the original
instructions
One phase, one earth and one neutral.
20-60 kHz, controlled by microprocessor.
COMBIDUCTION
230 V ~
50 Hz - 60 Hz
25 A
5,200 W
2,600 W
8 m
3 m
7 litres
Special welding coolant,10 litres
(ref. 052246)
IP 21
6,5 kVA
70
60 x 88 x 60 cm
T4 A - 250 VAC - 5x20
COMBIDUCTION AUTO 50 LG
25
Tabla de contenido
loading

Tabla de contenido