Maintenance Schedule - Abicor Binzel CR1000 Instructivo De Servicio

Ocultar thumbs Ver también para CR1000:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CR1000/CR1250

13.5 Maintenance schedule

No.
Maintenance
interval
1
Daily
2
Weekly
2
Monthly
3
Monthly
4
Every six months
5
Every six months
6
Every six months
7
Every six months
8
Annually
Tab. 12
Maintenance schedule
BAL.0351.0 • 2020-06-10
Maintenance schedule
Maintenance work to be carried
out
Check coolant level
Check the filter for dirt; clean/replace if
necessary
Clean the finned radiator using
compressed air, removing all dust
Check the coolant supply and return hoses
for dirt, replace if necessary
Change the coolant
Flush the finned radiator against the
direction of the supply/return flow
Rinse out the coolant container
Check the tightness of the connectors; if
necessary, tighten hose clamps using pliers
Inspection and testing during operation
Carried
Signature/
Next
out on
comment
maintenance
13 Appendix
EN - 25
Tabla de contenido
loading

Este manual también es adecuado para:

Cr1250

Tabla de contenido