Checklist - Thermador Pro Harmony PALPKITHW Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Checklist

Each of the following steps must be completed correctly
for the appliance to function properly. Check off each step
as it is finished.
Pro Harmony gas models
Ù
Disassemble the rangetop (page 8).
Step 1
Ù
Convert the regulator to LP gas (page 9).
Step 2
Ù
Change the STAR® burner orifices according
Step 3
to your model and the corresponding table
(page 9).
Ù
Set the valve screws for the STAR burners
Step 4
(page 12).
Ù
Check the flame and burner performance
Step 5
(page 17).
Ù
Remove the oven door (page 14).
Step 6
Ù
Remove the kick and front panels (page 15).
Step 7
Ù
Change the main oven broil burner orifice to
Step 8
the 1.25 mm (125) orifice (page 13).
Ù
48'' models – change the aux oven broil
Step 9
burner orifice to the 0.813 mm (813) orifice
(page 13).
Ù
Step 10 Change the main oven bake burner orifice to
the 1.34 mm (134) orifice (page 14).
Ù
Step 11 48'' models – change the aux oven bake
burner orifice to the 1.13 mm (113) orifice
(page 14).
Ù
Step 12 Check the rangetop and oven for gas leaks
(page 16).
Ù
Step 13 Reassemble the rangetop, door, kick and
front panels.
Ù
Step 14 Place the conversion label (page 18).
Pro Harmony dual fuel models
Ù
Disassemble the rangetop (page 8).
Step 1
Ù
Convert the regulator to LP gas (page 9).
Step 2
Ù
Change the STAR burner orifices according
Step 3
to your model and the corresponding table
(page 9).
Ù
Set the valve screws for the STAR burners
Step 4
(page 12).
Ù
Check the flame and burner performance
Step 5
(page 17).
Ù
Check the rangetop for gas leaks (page 16).
Step 6
Ù
Reassemble the rangetop.
Step 7
Ù
Place the conversion label (page 18).
Step 8
Pro Grand gas models
Ù
Disassemble the rangetop (page 8).
Step 1
Ù
Convert the regulator to LP gas (page 9).
Step 2
Ù
Change the STAR burner orifices according
Step 3
to your model and the corresponding table
(page 9).
Ù
Set the valve screws for the STAR burners
Step 4
(page 12).
Ù
Check the flame and burner performance
Step 5
(page 17).
Ù
Remove the oven door (page 14).
Step 6
Ù
Remove the kick and front panels (page 15).
Step 7
Ù
Change the main oven bake burner orifice to
Step 8
the 1.40 mm (140) orifice (page 14).
Ù
48'' models – change the aux oven bake
Step 9
burner orifice to the 1.13 mm (113) orifice
(page 14).
Ù
Step 10 Change the main oven broil burner orifice to
the 1.25 mm (125) orifice (page 13).
Ù
Step 11 48'' models – change the aux oven broil
burner orifice to the 0.813 mm (813) orifice
(page 13).
Ù
Step 12 Check the rangetop and oven for gas leaks
(page 16).
Ù
Step 13 Reassemble the rangetop, door, kick and
front panels.
Ù
Step 14 Place the conversion label (page 18).
Pro Grand dual fuel models
Ù
Disassemble the rangetop (page 8).
Step 1
Ù
Convert the regulator to LP gas (page 9).
Step 2
Ù
Change the burner orifices according to your
Step 3
model and the corresponding table
(page 10).
Ù
Set the valve screws for the STAR burners
Step 4
(page 16).
Ù
Check the rangetop for gas leaks (page 16).
Step 5
Ù
Reassemble the rangetop.
Step 6
Ù
Check the flame and burner performance
Step 7
(page 17).
Ù
Place the conversion label (page 18).
Step 8
Page. 7
Tabla de contenido
loading

Tabla de contenido