21
Attaching Front Sheaves
Using (1) 3/8" - 16 hex nut, attach the
Tools Needed:
front steel sheave in the appropriate
hole (left hand shown).
3" STEEL SHEAVE WITH 12" RADIUS
TRACK:
Bolt the sheave to the 13/32" hole near
the top of the fl agangle.
3" OR 4" STEEL SHEAVE WITH 15"
RADIUS TRACK:
Bolt the sheave to the fi rst 13/32" hole
in the horizontal angle.
Repeat for other side.
Remove the locking pliers from the
vertical tracks. With assistance, raise
the door slowly into the open position
making sure the door travels smoothly
through the track.
Clamp locking pliers to the back leg of
both horizontal tracks, below the bottom
rollers to keep the door from lowering.
28
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com
STEEL
SHEAVE
FLAGANGLE
3/8- 16"
HEX NUT
12" RADIUS TRACK
WITH 3" STEEL SHEAVE
HOLE LOCATION
15" RADIUS TRACK WITH
3" OR 4" STEEL SHEAVE
HOLE LOCATION
HORIZONTAL
ANGLE