Preparing The Opening; Installation - Wayne Dalton 8000 Instrucciones De Instalación Y Manual Del Usuario

Resorte de extensión
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

P5
WARNING
Tools Needed:
Recommended
FAILURE TO SECURELY ATTACH A SUITABLE
tools from
MOUNTING PAD TO STRUCTURALLY SOUND
page 5
FRAMING COULD CAUSE SPRINGS TO
VIOLENTLY PULL MOUNTING PAD FROM WALL,
RESULTING IN SEVERE OR FATAL INJURY.
If you just removed your existing door or you are installing a new door,
complete all steps in PREPARING THE OPENING.
To ensure secure mounting of track brackets or steel angles to new or
retro-fi t construction, it is recommended to follow the procedures outlined in
DASMA Technical Data Sheets #156, #161 and #164 at www.dasma.com.
The inside perimeter of your garage door opening should be framed with
wood jamb and header material. The jambs and header must be securely
fastened to sound framing members. It is recommended that 2" x 6"
lumber be used. The jambs must be plumb and the header level. The jambs
should extend a minimum of 12" (305 mm) above the top of the opening
for Extension spring applications. For low headroom applications, the jambs
should extend to the ceiling height. Minimum side clearance required, from
the opening to the wall, is 3-1/2" (89 mm).
IMPORTANT: Closely inspect jambs and header material. Any wood found
not to be sound, must be replaced.
Weather Seal (May Not Be Included):
Cut or trim the weather seal (if necessary) to the header and jambs.
For quick install track: Align the header seal with the inside edge of the
header and temporarily secure it to the header with equally spaced nails.
Next, fi t the jamb seals up tight against the header seal and fl ush with the
inside edge of the jamb. Temporarily secure the jamb seals with equally
spaced nails. This will keep the bottom section from falling out of the opening
during installation.
For fully adjustable track: Align the header seal 1/8" to 1/4" inside the
header and temporarily secure it to the header with equally spaced nails.
Next, fi t the jamb seals up tight against the header seal and 1/8" to 1/4"
inside the jamb. Temporarily secure the jamb seals with equally spaced
nails. This will keep the bottom section from falling out of the opening during

installation.

NOTE: Do not permanently attach weather seal to the jamb at this time.
HEADROOM REQUIREMENT: Headroom is defi ned as the space needed
above the top of the door for tracks, springs, etc. to allow the door to open
properly. If the door is to be motor operated, 2-1/2" (64 mm) of additional
headroom is required.
NOTE: 6" LHR Conversion Kit is available for 12" Radius only. Contact your
local Wayne-Dalton dealer.
BACKROOM REQUIREMENT: Backroom is defi ned as the distance needed
from the opening back into the garage to allow the door to open fully.
10
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.wayne-dalton.com

Preparing the Opening

HEADER BOARD
2" X 6" LUMBER
PREFERRED
LEVEL HEADER
PLUMB JAMBS
DOOR
WIDTH
HEADROOM
HEADER
WEATHER SEAL
JAMB
WEATHER
SEAL
JAMB
QUICK INSTALL TRACK
HEADROOM REQUIREMENT
TRACK TYPE
Extension Springs
15" Radius Track
12" Radius Track
6" LHR Kit
BACKROOM REQUIREMENT
DOOR HEIGHT
TRACK
6'6", 7'0"
12", 15" Radius
7'6", 8'0"
12", 15" Radius
SUITABLE MOUNTING
SURFACE 2" X 6"
LUMBER MINIMUM
DOOR HEIGHT
BACKROOM
JAMB
WEATHER
SEAL
JAMB
FULLY ADJUSTABLE TRACK
11-3/4"
10-1/2"
6"
MANUAL
MOTOR
LIFT
OPERATED
98"
120"
110"
132"

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

81008200

Tabla de contenido