Quick Start; General Inspection - RS Pro RSHS800 Serie Manual De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 109

Quick Start

General Inspection

Inspect the shipping container.
1.
Keep the damaged shipping container or cushioning material
until the contents of the shipment have been completely
checked and the instrument has passed both electrical and
mechanical tests.
The consigner or carrier will be responsible for damages to the
instrument resulting from shipment.
Inspect the instrument.
2.
If there are instruments found damaged, defective or failure in
electrical and mechanical tests, please contact us.
Check the accessories.
3.
Please check the accessories according to the packing list. If the
accessories are incomplete or damaged, please contact your
sales representative.
RSHS800
8
1
Tabla de contenido
loading

Tabla de contenido