Installation

Commissioning

10.3.11 Installation for offset tiles
This appliance can be installed where tiles are offset. See diagram
for maximum tile offset and minimum contact area of the appli-
ance. Adjust the wall clearance and lock the back panel with the
fixing toggle by turning it clockwise through 90°.
20
11. Commissioning
11.1 Commissioning
WARNING Electrocution
Commissioning must only be carried out by an authorised
contractor in accordance with safety regulations.
electronic
.
.
°C
45
40
50
35
55
30
60
Open and close all connected draw-off valves several times,
until all air has been vented from the pipework and the
appliance.
Activate the safety pressure switch at flow pressure by press-
ing the reset button. The appliance is supplied with the safe-
ty pressure limiter deactivated.
www.stiebel-eltron.com
electronic
°C
2. .
45
40
50
35
55
30
60
Push the temperature selector plug into the "set tempera-
ture" PCB. Ensure that the gasket pocket on the lower part of
the back panel is not bent and that it seals the lower part of
the user interface while the appliance cap is being installed.
Fit the appliance cap and secure with a screw.
Switch the mains power ON.
Calibrate the temperature by turning the temperature selec-
tor as far as possible clockwise and then anti-clockwise.
Check the appliance function.
Remove the protective foil from the user interface.

12. Appliance handover

Explain the appliance function to users and familiarise them
with its operation.
Make the user aware of potential dangers, especially the risk
of scalding.
Hand over these instructions to the user for safe-keeping.
DHB-E SLi | A electronic |