Commissioning; Appliance Handover - Stiebel Eltron DHB-E 11 SLI electronic Manual Del Usuario

Ocultar thumbs Ver también para DHB-E 11 SLI electronic:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
installation

commissioning

9.5.11
Installation for offset tiles
This appliance can be installed where tiles are offset. See diagram
for maximum tile offset and minimum contact area of the appliance.
Adjust the wall clearance and lock the back panel with the fixing
toggle by turning it clockwise through 90°.
Installation dimensions for offset tiles
10.
Commissioning
Danger of electrocution
Commissioning must only be carried out by an
authorised contractor in accordance with safety
regulations.
Commissioning
»
Open and close all connected draw-off valves several times, until
all air has been vented from the pipework and the appliance.
»
Activate the safety pressure limiter by pressing the reset button.
The appliance is supplied with the safety pressure limiter
deactivated.
»
Push the temperature selector plug into the "set temperature"
PCB. Ensure that the gasket pocket on the lower part of the back
www.stiebel-eltron.com
panel is not bent and that it seals the lower part of the user
interface while the appliance cap is being installed.
»
Fit the appliance cap and secure with a screw.
»
Switch the mains power ON.
»
Calibrate the temperature by turning the temperature selector
as far as possible clockwise and then anti-clockwise.
»
Check the appliance function.
»
Remove the protective foil from the user interface.
11.

Appliance handover

»
Explain the appliance function to the user and familiarise him/
her with its operation.
»
Make the user aware of potential dangers, especially the risk
of scalding.
»
Hand over these instructions to the user for safe-keeping.
dhB-e ... sli electronic |
33
Tabla de contenido
loading

Tabla de contenido