INSTALLATION
Installation
Fitting the base part of the back panel
f Position the lower back panel on the main back panel and
f
click it into place.
f Align the mounted appliance by loosening the fixing toggle,
f
aligning the power supply and back panel, and then re-tight-
ening the fixing toggle. If the back panel is not flush with the
wall, the appliance can be secured at the bottom with two
additional screws.
10.2 Alternative installation options
10.2.1 Electrical connection from below on unfinished walls
f Fit the cable grommet.
f
www.stiebel-eltron.com
3
L3 '
4
L2 '
1
L1 '
2
1
L1í
2
Material losses
!
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
f Break out the cable grommet knock-out in the back panel.
f
Deburr any sharp edges with a file if necessary.
f Reposition the mains terminal in the appliance from the top
f
to the bottom.
f Push the back panel over the threaded stud and the cable
f
grommet. Pull the cable grommet by the locking hooks into
the back panel using pliers, until both locking hooks audibly
click into place.
f Press the back panel firmly into place and lock the fixing tog-
f
gle by turning it clockwise through 90°.
10.2.2 Electrical connection on finished walls
Note
This type of connection changes the protection rating of
the appliance.
f Change the type plate. Cross out "IP 25" and mark
f
the box "IP 24". Use a ballpoint pen to do this.
Material losses
!
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
f Cleanly cut or break out the required cable entries in the
f
back panel (for positions, see chapter "Specification / Dimen-
sions and connections"). Deburr any sharp edges with a file if
necessary.
f Route the power cable through the cable grommet and con-
f
nect it to the mains terminal.
10.2.3 Connecting a load shedding relay
When operating additional electric appliances, such as electric
storage heaters, install a load shedding relay in the distribution
board. The relay responds when the instantaneous water heater
starts.
Material losses
!
Connect the phase that switches the load shedding relay
to the indicated terminal of the mains terminal in the
appliance (see chapter "Specification / Wiring diagram").
10.2.4 Water installation on finished walls
Note
This type of connection changes the protection rating of
the appliance.
f Change the type plate. Cross out "IP 25" and mark
f
the box "IP 24". Use a ballpoint pen to do this.
PEG 13-24 |
9