Completing The Installation; Commissioning; Initial Start-Up - Stiebel Eltron PEG Serie Operación E Instalación

Calentador instantáneo electrónico
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
INSTALLATION

Commissioning

f Fit water plugs with gaskets to seal the in-wall connection.
f
f Fit a suitable pressure tap.
f
f Click the lower section of the back panel into place in the
f
upper section of the back panel.
f Secure the connection pipes to the appliance.
f
f Secure the back panel at the bottom with two additional
f
screws.
Material losses
!
If you break open the wrong knock-out in the back panel
by mistake, you must use a new back panel.
f Cleanly break out the knock-outs in the appliance cover. De-
f
burr any sharp edges with a file if necessary.
f Slide the lower back panel under the connection pipes of the
f
tap and click the lower back panel into place.
f Secure the connection pipes to the appliance.
f
10.2.5 Water installation on unfinished walls for appliance
replacement
If the existing twin connectors of the old appliance only protrude
from the wall by approx. 16 mm, you cannot use the twin con-
nectors provided.
Note
With this connection, the cold water supply can only be
shut off within the domestic installation.
10
| PEG 13-24
f Seal and fit the screw-in tap extensions provided.
f
f Connect the appliance.
f

10.3 Completing the installation

f Open the shut-off valve in the twin connector or the cold
f
water inlet line.
11. Commissioning
WARNING Electrocution
Commissioning must only be carried out by a qualified
contractor in accordance with safety regulations.

11.1 Initial start-up

3
L3'
4
L2'
1
L1'
2
www.stiebel-eltron.com
Tabla de contenido
loading

Este manual también es adecuado para:

Peg 13Peg 18Peg 21Peg 24

Tabla de contenido