Promax AE-966 Manual De Instrucciones página 317

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6.2.14.4 Runs a series of internal tests upon power-up.
Background
1.- Press the System key.
2.- Press F6 (More).
3.- Press F2 (Self Test).
4.- The result appears in F1 ~ F4. (The GPIB
result appears only when the module is
installed).
5.- Press F6 (Return) to go back to the
previous menu.
Item
Page 126
Sign
Description
Internal reference signal, standard stability.
Internal reference signal, medium stability.
Available when the ±1ppm stability module is
installed.
Internal
(reserved).
External reference signal.
Runs a series of internal tests upon power-up. If any of the test
result shows fail, contact service personnel
GPIB:
The optional GPIB interface connection. Available
only when the GPIB module is installed.
Flash
Internal flash memory area for storing the system
code and data.
SDRAM
Internal SDRAM area on which the code runs.
RTC
The real-time clock that controls the date and time
setting.
USER'S MANUAL AE-966 / 967
reference
signal,
Self Test...
Pass Fail
Pass Fail
Pass Fail
Pass Fail
high
stability
System
More...
F 6
F 2
GPIB
F 1
Flash
F 2
SDRAM
F 3
RTC
F 4
Return
F 6
04/2016

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ae-967

Tabla de contenido