Honeywell HSB Y12 Guia De Instalacion página 26

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Section 5: Fuel Conversion/Gas Connections
LP Vapor Installation (typical)
A
NG BTU = ft
Megajoules = m
A.
B.
C.
D.
E.
F.
G.
H.
I.
22
B
F
G
H
3
/h X 2500
3
/h X 93.15
BTU and Pressure Decal
Check Distance with Gas Provider
Primary Fuel Pressure Regulator Per LP Provider
Manual Shut Off Valve
Secondary Fuel Pressure Regulator
Flexible Fuel Line
Sediment Trap
Manual Shut Off Valve With Pressure Port
Size fuel tank large enough to provide required BTUs for generator and ALL
connected appliance loads. Be sure to correct for weather evaporation.
B
D
E
Figure 5-6.
Installation Guidelines For 60 Hz Air-cooled Generators
C
I
000619b
Tabla de contenido
loading

Tabla de contenido