SICE S 560 Manual De Instrucciones página 54

Idiomas disponibles
  • ES

Idiomas disponibles

9) Move the tool carrier arm (14, Fig. D) back from the edge of the rim.
Tilt the arm to its non-working position.
Move the tool carrier arm to the inside plane of the wheel.
10) Turn the tool head 180°.
Lower the arm to its working position.
11) Take the mobile control unit to work position D.
12) Turn the spindle and at the same time bring the bead loosener disk up against
the tyre between the rim and bead.
Wait until the bead begins to detach before advancing with the disk until the ring
with taper housing is about 5 cm beyond the outer edge of the rim.
NB: Lubricate during this process.
13) Tip the tool carrier arm to its non-work position.
14) Take the mobile control unit to work position B.
15) Lower the spindle until the wheel is resting on the platform.
16) Translate the turntable inward until the tyre (with the ring with taper housing attached) is removed from the rim.
17) Remove the rim from the spindle.
18) Position the tyre on the platform with the ring with taper housing pointing towards the spindle.
19) Lock the ring with taper housing on the spindle as described for LOCKING THE WHEEL.
DANGER!
The tyre is not attached to the split ring completely safely.
Any strain on it during positioning or clamping operations could cause it to detach and fall.
20) Take the mobile control unit to work position D.
21) Lift the wheel.
22) Move the tool carrier arm back to its work position.
23) Position the spindle so that the bead breaker disk is lined up with the bead.
24) Turn the spindle while advancing with the bead loosener disk until the tyre completely detaches from the ring with taper housing.
DANGER!
When the beads come off the rim, the wheel will fall.
Check to make sure there are no by-standers in the work area.
BEAD BREAKING AND DEMOUNTING
(with use of MV clamps)
The PAIR OF MV CLAMPS (available on request), allows the bead wire to be fixed to the rim and the bead to be loosened at the same time.
Proceed as described below:
1) Carry out the operations described in points 1, 2, 3 of the previous section.
S 560
54
ENGLISH • Instructions manual
MV
Z/4
loading