Mounting The Centralized Controller/Direct Wiring; Mounting Preparations - Mitsubishi Electric MAC-821SC-E Manual De Instalación

Ocultar thumbs Ver también para MAC-821SC-E:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34

3. Mounting the Centralized Controller/Direct Wiring

3-1. Mounting Preparations

1
Remove 2 screws, and remove the base plate 2 from the switch box 3.
Set the 2 screws aside, as they will be used in the section on "4-1. Mounting
the Base Plate" under "Mounting the Centralized Controller".
2
Insert the switch box 3 into the wall. Size the hole in the wall to ensure that
there is go gap between the switch box 3 and the wall surface.
Use the switch box 3 wall installation dimensions and opening dimensions
shown in the figure below.
3
Feed the power supply wire B, connection wire C, and ground wire from
inside of the wall, and pull them through the switch box 3 into the room
about 150 mm.
In addition, when not using a conduit for a connection wire C, be sure to install a rubber seal (large) 5 or rubber seal (small)
6 into the hole in the switch box 3 before feeding the connection wire C through the hole.
Use the PG connection E prepared at the installation site to secure the power supply wire B in the hole in the switch box 3.
Switch box 3
Wall
0–5 mm
150 mm
4
After the screws have been removed from the cover of the centralized controller 1, remove the cover using a flathead
screwdriver.
6
Connection
wire C
Power supply wire B
57 mm or more
Screw M4
Base plate 2
* Do not make the hole any larger than
necessary.
Switch box 3
Rubber seal (large) 5
Switch box 3
PG connection E
Tabla de contenido
loading

Tabla de contenido