Troubleshooting; Dimensions And Connections; General View And Main Components - Ferroli PEGASUS 119 LN 2S Instrucciones De Uso

Ocultar thumbs Ver también para PEGASUS 119 LN 2S:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

PEGASUS LN 2S

4.4 Troubleshooting

Fault
Cure
After several lighting attempts , the
Clean the pilot burner nozzles with compressed air.
electronic controller shuts down the
Check the regular gas flow to the boiler and that the air has been eliminated from the
boiler.
pipes.
Make sure the electrodes are correctly positioned and free of deposits (see
Make sure the boiler is connected to an efficient earth connection.
Check the connections to the ignition and ionisation electrodes.
The electrodes are not discharging in
Make sure the electrodes are correctly positioned and free of deposits (see
the ignition phase.
Control thermostat adjusted too low.
Check the power supply.
Check the connections to the ignition and ionisation electrodes.
Check the connections to the electronic flame controller.
Make sure the LINE -NEUTRAL are not inverted and that the earth contacts are effi-
cient.
Check the inlet gas pressure and any open gas pressure switches.
Reset the safety thermostat.
Make sure the room thermostat is closed.
The burner burns poorly: flames too
Gas valve filter dirty.
high, too low or too yellow
Check the gas supply pressure.
Gas nozzles dirty.
Make sure the boiler is not dirty.
Make sure the ventilation in the room where the unit is located is sufficient for proper
combustion.
Smell of unburnt gas
Make sure the boiler is clean.
Check the flue draught.
Make sure gas consumption is not excessive.
The boiler works but the temperature
Check correct operation of the 2-stage control thermostat.
fails to increase
Make sure the gas valve 2nd stage operator (max. power) is fed.
Make sure gas consumption is not less than that provided for.
Make sure the boiler is perfectly clean.
Make sure the boiler is adequate for the system.
Make sure the heating pump is not blocked.
Temperature of the water to system too
Check correct operation of the 2-stage control thermostat.
high or too low
Make sure the heating pump is not blocked.
Make sure the characteristics of the circulating pump are adequate for the system.
Explosion at burner. Ignition delays
Make sure the gas pressure is sufficient and that the boiler casing is not dirty.
The control thermostat switches back
Make sure the bulb is properly inserted in the sheath.
on with too great a temperature differ-
Check correct operation of the 2-stage thermostat.
ence
The boiler produces condensation
Make sure the boiler is not operating at too low temperatures (below 50°C).
water
Make sure gas consumption is regular.
Check the efficiency of the flue.
The boiler goes out for no apparent
Safety thermostat activation due to an overtemperature.
reason
To avoid unnecessary expense, before calling the After-Sales Service make
A
sure the boiler has not stopped due to no power or gas.
5. TECHNICAL DATA AND CHARACTERISTICS

5.1 Dimensions and connections

A
F
B
fig. 12 - Dimensions and connections
A
Version PEGASUS 80 - 125 LN 2S
B
Version PEGASUS 160 - 250 LN 2S
B
A
C
E
a2
a3
a1
D
cod. 3540T612 - Rev. 01 - 02/2015
Type and model
A
PEGASUS 119 LN 2S
930
PEGASUS 136 LN 2S
1020 148 250 53 45 1050
PEGASUS 153 LN 2S
1100 148 250 58 43 1050
fig. 10
).
PEGASUS 170 LN 2S
1190 173 300 60 46 1050
PEGASUS 187 LN 2S
1270 173 300 58 44 1050
fig. 10
).
PEGASUS 221 LN 2S
1440 173 300 57 45 1050
PEGASUS 255 LN 2S
1610 198 350 62 46 1100
PEGASUS 289 LN 2S
1780 198 350 66 49 1100

5.2 General view and main components

A
9
8
7
17
16
14
13
15
fig. 13 - General view and main components
A
Version PEGASUS 80 - 125 LN 2S
B
Version PEGASUS 160 - 250 LN 2S
Key
1
"0 - 1 - TEST" switch
2
2-stage control thermostat
3
2nd stage electronic controller reset button
4
1st stage electronic controller reset button
5
Thermohydrometer
6
Plug
7
Safety thermostat
8
Prearrangement for fitting an electronic controller
9
Fume point on fume chamber
12
Gas pressure switch
13
Pilot burner complete with electrodes
14
Gas manifold
15
Pressure point
16
Drain cock
17
Gas valve with elect. controller 1st stage
17A
1st stage gas valve
18
Gas valve with elect. controller 2nd stage
18A
1st stage gas valve
a1
B
C
D
E
F
heating
return
133 220 50 42 1050
2"
2"
2"
2"
2"
2"
2"
2"
B
5
4
6
3
2
1
12
18
13
17
15
EN
a2
a3
heating
Gas
delivery
inlet
2"
1"
2"
1"
2"
1" 1/2
2"
1" 1/2
2"
1" 1/2
2"
1" 1/2
2"
1" 1/2
2"
1" 1/2
18
18A
17A
33

Hide quick links:

Tabla de contenido

Solución de problemas

loading

Tabla de contenido