Initial System Set-Up; Preparing The System For Use - Hologic Aquilex Instrucciones De Uso

Ocultar thumbs Ver también para Aquilex:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 179
4

Initial System Set-up

Always check all parts and accessories of the system when performing initial set-
up. If the system has obvious defects, contact Hologic Technical Support (Chapter
14, Warranty Information).
Place the system on a level surface and install in a dry environment. The ambient
temperature and humidity must meet the requirements mentioned in Chapter
11, Technical Data.
WARNING!
Equipment should be positioned such that power cord can be easily disconnect-
ed.
CAUTION!
Indoor climate
Before switching on the device, sufficient time must have passed to adjust to the
indoor climate.
4.1

Preparing the System for Use

WARNING!
The Aquilex Fluid Control System should not be used directly next to other devic-
es as this could result in malfunctions. The Aquilex Fluid Control System was test-
ed for compliance with IEC 60601-1-2 as a stand alone system. Therefore, do not
stack other devices (e.g. MyoSure® Control Unit) on the system or the Irrigation
Pump Unit. In particular, do not place any other device than the AQL-100P on the
trays of the AQL-100CBS. If usage in the manner described above is nevertheless
required, this system and the other devices should be monitored to make sure
they function properly.
CAUTION!
Check to ensure the available wall outlet voltage matches the data listed on the
label attached to the back of the system. Incorrect voltage can cause errors and
malfunctions and may destroy the system.
Ensure the connection data and technical specifications of the power supply
comply with DIN VDE or national requirements. The wall outlet power supply
cord must be plugged into a properly installed safety wall plug (see DIN VDE
0107). Read the device label located in rear of pump to determine the operating
voltage of the system.
The power connection must be equipped with a grounding contact. Use the Aq-
uilex power cord to establish a connection between the wall outlet and the pow-
er cord connection located in the rear of the system.
Use only a certified (UL-listed), removable power cord, type SJT, minimal 18 AWG,
3 leads. The plug connectors must comply with NEMA 5-15 or IEC 320/CEE22.
Grounding will only be reliable if the equipment is connected to a corresponding
hospital grade outlet.
Integrate the system into the potential equalization system as specified by local
safety rules and regulations.
Initial System Set-up
Initial system set-up
Connection to the wall outlet
Grounding contact
Only for U.S. operators
Potential equalization
en
13
Tabla de contenido
loading

Tabla de contenido